For closed cut valleys shingles on one roof plane are installed through a valley and extended at least 30 cm into the intersecting plane.
How to shingle a valley in a roof.
Continue until you reach the top edge of the valley roof.
Valleys are a prime leak area so it s important to be careful.
Step 6 shingle valley.
Secure all of the 3 tab shingles to the roof plane with the 1 inch roofing nails using the local building codes as a placement guide except for the shingles covering the flashing material.
To shingle out of the valley with laminated shingles lay a shingle down as a gauge and mark the corner at the bottom left and top right of the roof.
Lay one and two tab shingles as you near the valley so full size shingles will run across the valley.
The next shingle should be directly atop the first one.
Gaf mastering the roof chapter 12 this video demonstrates the proper installation technique for installing roofing valleys.
Extend the 3 tab shingles on one of the roof s planes past the valley at least 12 inches.
The open woven and closed cut methods are demonstrated.
Stop nailing 6 inches from the center.
In order to shingle this kind of roof valley a roofing professional has to install both roof faces at the same time which is quite slow.
I then move the shingle to the uppermost course on the roof plane line up the mark on the shingle with the valley center and again mark the corner.
Shingle the other side of the valley the same way.
Roof one side of the valley running the shingles across it.
A woven valley shingle installation has other drawbacks including that they are slow to install especially in cold weather and more difficult to repair than the other types.
Shingles from the other side are run through the valley center line and cut along a line parallel to and 4 cm from the center line.
Snap a chalkline 2 to 3 inches past the valley center on the top layer of shingles.