Http bit ly 2tdla40 full roofing install playlist.
How to square a roof for tin.
Downside to this would be obviously the taper in the first and last panel.
Cut angle on every sheet at the bottom.
Install square to drip edge and run it out of parallel allow flashing to cover difference.
This is the width of the building between both outside supporting walls.
Make sure the walls are square.
4 find the square footage by adding up the total for each section.
Measure the vertical distance rise from the 12 inch mark on the level run to the underside of the same rafter.
Do this by measuring three feet out from the corner along one wall and marking it accurately.
Support us on patreon.
If any roof diagonals are long run a cable and come along from truss peak to opposite corner column along purlin underside.
Work from a stepladder and inspect all bolted connections at the upper ends of each corner post or corner assembly.
Use measuring tools to find the length and width of the roof from the ground outside.
Pull slowly until dimensions are equal.
A very small tug can change a diagonal drastically.
As the roof steel is installed you will notice the building becoming very stiff.
Figure out the slope of the roof by setting a carpenter s level on the underside of one rafter in the attic.
For example if your roof measures 10 feet 3 0 m x 10 feet 3 0 m and the slope of the roof is 12 12 giving a slope factor of 12x12 12x12 12 converts to 1 414 in decimal form you would multiply 10 x 10 x 1 414 to get the total of 141 square feet of roofing.
By severe i mean that on a roof that measures 17 feet from eave to ridge and a little over 29 ft wide i snapped my lines for starting out square using multiples of the 3 4 5 method and found out that the roof was basically a trapezoid being 5 inches out of square at the top left of the roof and approximately the same on the right hand lower.
How to square a metal roof.
Downside to this would be a non factory sealed cut exposed to the weather.
Slope is calculated as rise over run.
Determine the direction.
Loosen the bolted connections at the lower ends of each post or corner assembly to allow the shelter to be squared.